Our Work // Healthcare // Electrical Construction

Spanish Fork Hospital

Spanish Fork, UT

Project Details

  • GENERAL CONTRACTOR
    Okland Construction
  • OWNER
    Intermountain Healthcare
  • INDUSTRY
    Healthcare
  • SQ FT
    234,522 sq ft
  • CVE DIVISIONS
    Electrical Construction | BIM/VDC | Prefabrication | Preconstruction | Multimedia | Teledata

Project Overview

Cache Valley Electric—in partnership with Okland Construction—is currently constructing the Spanish Fork Hospital, another successful project with Intermountain Healthcare. This project is a four-story hospital that includes four operating rooms (with a shell space to add two more), two endoscopy rooms, two C-section operating rooms, five LDR (labor, delivery, and recovery) rooms, three birthing rooms and 28 patient rooms, as well as rooms for MRI, CT scan, radiology, radiation, and fluoroscopy. A three-story medical office building will also connect to the hospital.

CVE’s site package includes bringing in two separate utility feeds into the project, installing 89 site lighting pole fixtures, as well as light fixtures for the helipad. Our work also includes: building a remote central utility plant, housing three generators (with an option to add a fourth at a future date), and installing a tunnel from the central processing plant to the hospital.

Our CVE team coordinated, designed and prefabricated the headwalls in the patient room. We utilized BIM to include the setup for electrical, gas and mechanical. This saved time and labor costs by having one trade—instead of several—on-site during installation. 

In designing and coordinating the head walls, we were able to incorporate the backing required for the rooms with the installation of the electrical. Providing a sheet metal sheet with our boxes cut out with a laser. This saved the general contractor from having a separate contractor install backing. Insured that all rooms would be the same and saved installation time.

The Teledata Division will be doing all the basket tray, J-Hook pathways, Fiber / Copper Backbone, voice/data, camera, WAP, TV, TOTGuard, Nurse Call home run cabling for the Hospital and Clinic at Spanish Fork. Brett Paxman is the project foreman and will oversee the installation of over 1 million feet of Siemon CAT6A F/UTP cable. The Spanish Fork Hospital will have a TEC (Data Center) in it with 11 cabinets that include a fiber-and-copper cross-connect infrastructure. We have completed four other Intermountain Healthcare hospital projects this year as well.

The Multimedia Division will be doing all the AV, overhead paging and sound masking for the project as a subcontractor under Teledata.

Scope of Work:

  • Set up the power for the utility yard that included: installation of a medium voltage meter cabinet, transition switch, and 600 amp pad mounted switch.
  • 2-2500 KVA 12470/480 transformer and 1-2000 KVA 12470/480 transformer
  • Worked closely with Spanish Fork Power to meet all city requirements.
  • Installed of the black Diamond Video infrastructure for the operating rooms and the endoscopy rooms.
  • Our teledata group is installing the telecom infrastructure.
  • Our multimedia group is installing the paging system and multimedia equipment for the conference rooms and classrooms.