Our Work // Heavy Industrial // Heavy Industrial Electrical Construction
Nucor Steel Florida
Frostproof, FL
Project Details
GENERAL CONTRACTOR
Nucor Steel
OWNER
Nucor Steel
INDUSTRY
Heavy Industrial
SQ FT
400 acres
CVE DIVISIONS
Heavy Industrial Electrical Construction | Substation
Project Overview
CVE recently completed a new steel mill electrical construction project for Nucor Steel. Nucor Steel Frostrpoof Florida, a 400-acre site, is a new Micro Mill that produces approximately 350,000 tons of rebar a year.
Scope of Work
Site 2MV pole line
Embedded conduit and site utilities
From 13.8KV distribution to 480V
Installation of all distribution gear including medium voltage switch gear, 480V switch gear, panels, PCR control houses and control cabinets
Plant Process and Network communications
All process, automation, control, and instrumentation installation
Heavy Industrial Electrical Construction , Substation
Nucor Steel Florida
Project Overview
CVE recently completed a new steel mill electrical construction project for Nucor Steel. Nucor Steel Frostrpoof Florida, a 400-acre site, is a new Micro Mill that produces approximately 350,000 tons of rebar a year.
Scope of Work
Site 2MV pole line
Embedded conduit and site utilities
From 13.8KV distribution to 480V
Installation of all distribution gear including medium voltage switch gear, 480V switch gear, panels, PCR control houses and control cabinets
Plant Process and Network communications
All process, automation, control, and instrumentation installation